Thursday, 27 December 2007

Normal service...

...or what passes for it, is being resumed. The winter cold is relinquishing its grip and I was able to do a little work on the tower project today. All the component parts are now fixed together, and the base of the sloping roof connecting the main tower body with the turret is in place. Next, I'll fashion a suitable doorway, and a gateway for the short length of wall that will run from the tower base. The off-cut of plywood the tower was attached to warped, but luckily all the damage was at one end and was easily removed. I'll now glue the whole to a larger - stable - baseboard, and add smaller buildings to this. It'll fit in with the Shako rules which rates tabletop settlements by up to three sectors according to scenario - a sector being a group of buildings covering a few square inches.

1 comment:

Bluebear Jeff said...

Pictures, pictures, we want pictures.


-- Jeff